Services

Provisional measures

1

Temporary instrumentation

CNS deploys temporary solutions at sites without instrumentation. These temporary measures meet ad hoc instrumentation needs or support development of a diagnosis, with the goal of regulatory compliance or system optimisation. The customised projects are tailored to needs and the environment, to avoid an impact on the study field. Following these temporary measures, CNS teams can guide you in implementing permanent instrumentation systems that meet the needs identified.

imgp3149_1_.jpg
2

Scope

These measurement campaigns are conducted in a range of areas. They may form part of a blueprint, self-monitoring, or an optimisation campaign for a production unit. For example, CNS has implemented temporary measures in:

  • Sewage network (sampling tied to flow, speed, etc.)
  • Water systems (pressure, flow, quality, etc.)
  • Industrial equipment (energy use, energy ratios, etc.)
  • Water supply (flow measurements)
017.jpg